Third rail power installation completed under Kanpur Metro Rail Phase I Project
The installation of third rail power system on the Baradevi-Naubasta elevated stretch under Kanpur Metro Rail Project Phase I has been completed. This section is about 5.3 km long and the power system supplies 750 volt DC to the metro trains. Track construction […]
