The detailed project report (DPR) for the Mararikulam-Alappuzha Rail Line Doubling Project has been prepared. It is expected to be submitted to the Railway Board soon.
The project involves doubling the line from Mararikulam to Alappuzha section in Kerala at an estimated cost of Rs 2.05 billion.
