10 firms shortlisted for implementation of package III of Vapi-Bodeli Four Laning Road Project

A total of 10 firms have been shortlisted as financially qualified for implementation of package III of Vapi-Bodeli Four Laning Road Project (NH-56).

These include Adani Enterprises Limited, Dilip Buildcon Limited, Dineshchandra R. Agrawal Infracon Private Limited (DRAIPL), G R Infraprojects Limited, H.G. Infra Engineering Limited, Kalthia Engineering and Construction Limited, MKC Infrastructure Limited, Oriental Structural Engineers Private Limited, PNC Infratech Limited, and RKC Infrabuilt Private Limited.

Bids for the same were invited by the National Highways Authority of India (NHAI) in October 2022.
Package III involves four laning of 38.29 km long road stretch from 94.03 km at junction with existing NH-56 (existing 414.64 km) in Jabugam Village in Bodeli Taluka to 132.32 km (existing 454.50 km) in Dhamasiya Village in Naswadi Taluka section of NH-56 at an estimated cost of Rs 9,573 million. It is being implemented on hybrid annuity mode (HAM) basis.