Larsen & Toubro has won a contract worth Rs 30.36 billion for the construction of a new terminal (T2) at the Bengaluru international airport as a part of the Bengaluru Airport Expansion Project, Phase II. In another development, AAI, on September 18, 2018, signed a contract agreement with NCC Limited for the construction of a new integrated passenger terminal building at Lucknow airport. The contract worth Rs 10.48 billion, includes the construction of a new terminal building, and airside and cityside development besides merging the old terminal with the existing domestic terminal to form an integrated building.
