The Ministry of Railways (MoR) has completed the survey works for the Birari-Mahoba Rail Line Doubling Project.
The project involves doubling of a 229 km long railway line from Mahoba to Birari in Uttar Pradesh via Khajuraho in Madhya Pradesh.
The Ministry of Railways (MoR) has completed the survey works for the Birari-Mahoba Rail Line Doubling Project.
The project involves doubling of a 229 km long railway line from Mahoba to Birari in Uttar Pradesh via Khajuraho in Madhya Pradesh.
COPYRIGHT © 2016- 2025 | INDIAN INFRASTRUCTURE