NTPC commences operations of 660 MW unit at Barh super TPP in Bihar

NTPC Limited has commenced operations of Unit #3 (660 MW) of the Barh super thermal power project (TPP), stage-I (3×660 MW) in Bihar.

With the commissioning of this unit, the total installed and commercial capacity of NTPC now stands at 82,080 MW.