Madhya Pradesh Metro Rail Corporation Limited has conducted trial runs on a 11.5 km Super Corridor 3 – Malviya Nagar Square (Raddisson Square) stretch under the Indore Metro Rail Phase I Project.
The stretch is likely to be completed by January 2026, with operations commencing in early 2026.
The Indore Metro Project involves development of a metro rail transit system comprising a ring line of length 31.55 km at an estimated cost of Rs 75 billion.
