NTPC Green Energy Limited has commissioned the second part capacity of 165 MW out of the 1,200 MW Khavda-II solar photovoltaic project in Gujarat. With this addition, the commercial capacity of NTPC Green Energy Limited Group has increased from 8,827.68 MW to 8,992.68 MW.
