Alstom Transport India Limited has rolled out first of the 39 driverless trainsets under the Mumbai Metro Phase II Line 4 Project (Wadala-Ghatkopar-Teen Haat Naka (Thane)-Kasarwadavli) and Mumbai Metro Phase II Line 4A Project (Kasarvadavali-Gaimukh).
Besides, it was designed at Sri City in Andhra Pradesh in collaboration with Larsen and Toubro Limited (L&T).
The Line 4 of Mumbai Metro involves development of 32 km long metro network to connect Wadala-Ghatkopar-Teen Haat Naka (Thane)-Kasarwadavli in Maharashtra at an estimated cost of Rs 145.49 billion.
The Line 4A involves development of 2.7 km long metro network from Kasarvadavali to Gaimukh at an estimated cost of Rs 9.49 billion.
