NTPC Green Energy Limited (NGEL) has commissioned the first part-capacity of the 50 MW out of the 200 MW Dayapar wind energy project phase II in Gujarat.
The capacity has been commissioned by NTPC Renewable Energy Limited, a wholly owned subsidiary of NGEL. Following the addition, NGEL’s total installed capacity has increased from 9,151.08 MW to 9,201.08 MW.
