National High Speed Rail Corporation Limited (NHSRCL) has launched the 40 m long steel Prestressed Concrete (PSC) steel girder at Sakhare Village, Dahanu under the Mumbai-Ahmedabad High-Speed Rail (HSR) Corridor Project.
The project involves development of the 508.17 km long Mumbai-Ahmedabad HSR corridor in Maharashtra and Gujarat with an investment of Rs 1,080 billion.
