The National High Speed Rail Corporation Limited (NHSRCL) has launched the 70 meter-long steel girder over the Dedicated Freight Corridor Corporation of India Limited (DFCCIL) tracks near Vadodara under the Mumbai-Ahmedabad High-Speed Rail (HSR) Corridor Project. With this, seven steel bridges in Gujarat under the project have been completed.
The project involves the development of the 508.17 km long Mumbai-Ahmedabad HSR corridor in Maharashtra and Gujarat with an investment of Rs 1,080 billion.
