National High Speed Rail Corporation Limited has completed the construction work on a 210 metre prestressed concrete bridge crossing National Highway (NH 48) at Dhaban village near Nadiad under the Mumbai-Ahmedabad high-speed rail corridor project.
National High Speed Rail Corporation Limited has completed the construction work on a 210 metre prestressed concrete bridge crossing National Highway (NH 48) at Dhaban village near Nadiad under the Mumbai-Ahmedabad high-speed rail corridor project.
COPYRIGHT © 2016- 2025 | INDIAN INFRASTRUCTURE