Commissioner of Railway Safety conducts safety inspection on Shisho-Kakarghatti rail section in Bihar 

The Commissioner of Railway Safety has conducted a safety inspection on the 9.48 km long Shisho-Kakarghatti section of the Darbhanga Bypass Railway Line Doubling Project.

The project involved construction of a 9.84 km long bypass line in Darbhanga connecting Shisho Halt and Kakarghati stations in Bihar at an estimated cost of Rs 2.53 billion.