NTPC Limited has commissioned and commenced the first part of its 200 MW Gujarat solar photovoltaic (PV) project in Sadla, Gujarat.
This first phase, with a capacity of 37.50 MW, has been developed by NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC through NTPC Green Energy Limited.
With this addition, the total installed and commercial capacity of the NTPC group has reached 76,598.18 MW.
