The Commissioner of Railway Safety (CRS) conducted a safety inspection on the 4.8 km long Anpara road-Anpara rail section of the Karaila road-Shaktinagar doubling project. With this, the entire project stands completed.
The project involved doubling of the existing 32.15 km long rail line between Karaila road and Shaktinagar in Madhya Pradesh and Uttar Pradesh respectively at an investment of Rs 5.41 billion.
