The Commissioner of Railway Safety conducted a safety inspection on the Pamban new railway bridge project.
The project involves construction of a new 2.05 km long bridge near Pamban bridge in Tamil Nadu in place of the existing scherzer rolling lifting bridge on the Mandapam-Pamban rail line at an investment of Rs 5.6 billion. It will be a vertical leaf type bridge.
