Commissioner of Railway Safety conducts safety inspection on Prayagraj-Prayagraj Rambagh rail section in Uttar Pradesh

The Commissioner of Railway Safety (CRS) has conducted a safety inspection on the 2.22 km long Prayagraj-Prayagraj Rambagh section of the Varanasi-Madhosingh-Allahabad rail line doubling project.

The project involves doubling of 120.2 km long track between Varanasi and Allahabad in Uttar Pradesh at a cost of Rs 9.43 billion.