East Central Railway (ECR) has commissioned 154 km out of the total 160 km of the Ramna-Singrauli line doubling project.
The project involves doubling of the 160 km long Ramna-Singarauli railway line with an investment of Rs 26.76 billion. It will cover the districts of Garhwa in Jharkhand, Singrauli in Madhya Pradesh, and Sonbhadra in Uttar Pradesh.
