National High-Speed Rail Corporation Limited (NHSRCL) has completed the casting of 1000 full-span box girders each at Vadodara and Vapi casting yards under the Mumbai-Ahmedabad high-speed rail (HSR) corridor project.
The project involves the development of a 508.17 km long Mumbai-Ahmedabad HSR corridor in Maharashtra and Gujarat with an investment of Rs 1,080 billion.
