National High-Speed Rail Corporation Limited (NHSRCL) is expected to complete 1.4 km of bridge work over the Narmada river on the Mumbai-Ahmedabad high-speed rail (HSR) corridor project in Gujarat soon.
Besides, 19 out of the 25 well foundations of the bridge have been completed and the erection of the superstructure has also commenced.
