National High-Speed Rail Corporation Limited (NHSRCL) has completed the construction work on 280-metre long Vatrak river bridge in the Kheda district under the Mumbai-Ahmedabad high-speed rail (HSR) corridor project.
The project involves development of the 508.17 km long Mumbai-Ahmedabad HSR corridor in Maharashtra and Gujarat with an investment of Rs 1,080 billion.
