Karbonsteel Engineering Private Limited has completed trial assembly work on the first 100-meter span of the GAD 15 bridge under Package C-4 for the Mumbai-Ahmedabad high-speed rail corridor (HSR) project.
The project involves development of the 508.17 km long Mumbai-Ahmedabad HSR corridor in Maharashtra and Gujarat with an investment of Rs 1,080 billion.
