Kolak bridge work completed on Mumbai-Ahmedabad high-speed rail corridor project

The National High-Speed Rail Corporation Limited has completed 160 m of bridge work over the Kolak river on the Mumbai-Ahmedabad high-speed rail corridor project. With this, nine out of 24 bridges have been completed.

The project involves the development of the 508.17 km long Mumbai-Ahmedabad high-speed rail corridor in Maharashtra and Gujarat with an investment of Rs 1,080 billion.