IR achieves track renewal of 5,950 tkm during 2023-24

Indian Railways (IR) has achieved track renewal of cumulative 5,950 track km (tkm) during 2023-24. It is around 14 per cent higher than the track renewal of 5,227 tkm achieved in 2022-23.

This will improve overall efficiency along with maintaining higher standards of safety for the trains. Meanwhile, IR has a total running track length of 104,647 km and route length of 68,426 km.