The Research, Design and Standards Organisation (RDSO) has begun inspection on Mumbai Metro Phase I Line 3 Project (Colaba-Bandra-SEEPZ). The inspection is likely to be completed in 10 days.
Line 3 of Mumbai Metro involves the development of an underground metro rail system in Mumbai connecting Colaba to SEEPZ via Bandra covering a distance of 33.5 km with an investment of Rs 372.76 billion. The project, which is being implemented by Mumbai Metro Rail Corporation Limited (MMRCL) on engineering, procurement, and construction (EPC) basis, consists of a total of 27 stations.
