Afcons completes 394 m long ADIT tunnel under Mumbai-Ahmedabad high-speed rail corridor project

Afcons Infrastructure Limited has completed construction of a 394 m long Additionally Driven Intermediate Tunnel (ADIT) under Package C-2 of the Mumbai-Ahmedabad high-speed rail corridor project. The project involves development of the 508.17 km long Mumbai-Ahmedabad high-speed rail (HSR) corridor in Maharashtra and Gujarat with an investment of Rs 1,080 billion.

It is being implemented by a special purpose vehicle (SPV), named National High-Speed Rail Corporation Limited (NHSRCL), incorporated by the Ministry of Railways (MoR) and the respective state governments of Maharashtra and Gujarat with an equity stake of 50:25:25 respectively.