Mumbai Metro Line 4 to be operational by August 2025

Mumbai Metro Phase II Line 4 (Wadala-Ghatkopar-Teen Haat Naka (Thane)-Kasarwadavli) is likely to be operational by August 2025.

The Mumbai Metro Green Line 4 is an elevated station under construction that spans across 32.32 km from Bhakti Park to Kasarvadavali and has an estimated cost of Rs 145.49 billion.