Tata Power Solar Systems Limited has commissioned solar and battery energy storage system (BESS) project in Rajnandgaon, Chhattisgarh. The project consists of a 100 MW photovoltaic (PV) facility combined with a 120 MWh utility-scale BESS. The project has been developed at an investment of Rs 9.45 billion, on the basis of engineering, procurement, construction (EPC) model. The plant consists of 239,685 bifacial monocrystalline modules.
