KP Energy commissions 10.5 MW wind power project

KP Energy Limited has commissioned 10.5 MW wind power capacity under Phase V of the 250.8 MW ISTS connected wind power project. It consists of five wind turbine generators of 2.1 MW each at Sidhpur site in Devbhoomi Dwarka. With this, a total of 138.6 MW capacity has been commissioned under the project. The project is being implemented by Apraava Energy Private Limited. KP Energy is the turnkey balance of plant solution provider for the project.