About 90 per cent of construction work has been completed on Mumbai Trans Harbour Link (MTHL) Project.
It is likely to open for public use by November 2023.
The project involves construction of a six-lane road bridge across the Mumbai Harbour between Sewri on the island city side (in the Mumbai Port Trust area) and Nhava/Chirle on the Navi Mumbai side. The link is about 22 km long with a 16.5 km bridge across the sea and a 5.5 km long viaduct on the land. The exit and entry into this freeway would be through inter-changes at the end points and at the intermediate points on the Navi-Mumbai side.