The Haryana government recently conducted an aerial survey for the Hisar airport upgradation project Phase II. The project involves the construction of an integrated terminal building, cargo terminal, air traffic control tower cum technical block, fire station building with fire control tower including ancillary buildings and other associated works for the development of an integrated aviation hub at Hisar airport in engineering, procurement and construction (EPC) mode at an estimated cost of Rs 4.65 billion.