NCC Limited has commenced U-girder work under Package 3 of the Bengaluru Metro Rail Project-Phase 2B (Bengaluru Airport Corridor)
The Phase 2B of Bengaluru metro involves development of a metro rail system, spanning a length of 38 km, to connect Nagawara-Hebbal-Bengaluru Airport, at an estimated cost of Rs 105.84 billion.