Larsen & Toubro Limited (L&T) has emerged as the lowest bidder (L1) for the implementation of the Nariman Point-Colaba Cuffe Parade Bridge Project on an engineering, procurement and construction (EPC) basis. The company has quoted an amount of Rs 3.16 billion. The completion period for the work is 2.5 years. The scope of work includes the design and construction of a 1.77 km long four-lane bridge connecting Nariman Point to Colaba Cuffe Parade in Maharashtra in EPC mode at an estimated cost of Rs 3.15 billion.