MoRTH lays foundation stone for Aroor-ThuravoorThekku Road Project

The MoRTH laid the foundation stone for the Aroor-ThuravoorThekku Six Lane Elevated Road Project (NH-66) in Kerala. The work on the project is expected to be completed by December 2024. The project involves the construction of a 12.75 km long six-lane elevated corridor along with the development of the existing four-lane road at the ground level, connecting Aroor to ThuravoorThekku from 366.33 km to 379.08 km on NH-66 under the BharatmalaPariyojana. The project is being implemented on an engineering, procurement and construction (EPC) basis at an estimated cost of Rs 19,938.8 million.