The Ennore LNG terminal project was inaugurated on March 6, 2019. The project has been developed by IOCL through Indian Oil LNG Private Limited, a special purpose vehicle (SPV), incorporated for the project. It involved setting up of a 5 million tonne per annum (mtpa) LNG import, storage and regasification terminal at an estimated cost of Rs 51.5 billion in Kattupalli, Chennai.
