In a meeting held with telecom operators to review the call drop situation, DoT has directed operators to complete the installation of additional towers, small cells and towers on wheels by March 2018 as per commitments made during 2017-18. DoT also directed operators to fast track tower installations in Delhi, Mumbai, and areas of Bihar and Uttar Pradesh, that are worst affected by call drops.
