Foundation stone laid for international ship repair facility at Cochin port

The foundation stone for an international ship repair facility at Cochin port was laid on November 17, 2017. The facility will include a shiplift system (130 x25 metres) with a lifting capacity of 6,000 tonnes, six workstations and a transfer system. It is estimated to entail an investment of Rs 9.7 billion.