The CCEA has granted approval for three railway projects in Maharashtra, Andhra Pradesh and Uttar Pradesh. These are the Manmad-Jalgaon third line project, involving the electrification and construction of a 160 km third line between Manmad and Jalgaon in Maharashtra, at an estimated cost of Rs 11.98 billion; the Shahganj-Bhatni-Phephna-Indara and Mau-Shahganj line-doubling project, involving the construction of a 150 km double line with electrification between Phephana and Indara and Mau and Shahganj (excluding the Indara-Mau line) in Uttar Pradesh, at an estimated cost of Rs 11.9 billion; and the Guntur-Guntakal line doubling project involving the construction of a 401.47 km double line with electrification between Guntur and Guntakal in Andhra Pradesh, at an estimated cost of Rs 36.31 billion.