An electronic interlocking and massive yard remodelling project has been commissioned at Dadri railway station in Uttar Pradesh, which falls under the Allahabad division of North Central Railway. This project is part of the ongoing process of modernisation of the IR network. Electronic interlocking at the station involves 318 routes adopting the most modern signalling system with centralised operation controlling 45 signals, 74 points and 176 track circuits with yard remodelling. The system has been commissioned in a record time of only 150 minutes.