The MoR and the Odisha government have signed an MoU for sharing the cost of two new railway line projects in Odisha. The projects entail the construction of a 130 km line from Jeypore to Malkangiri and a 38 km line from Jeypore to Nabarangpur. While the Odisha government will bear 25 per cent of the total cost of construction of the Jeypore-Malkangiri line, it will bear the total land costs and 50 per cent of the total construction costs of the Jeypore-Nabarangpur line. The detailed project report (DPR) for the Jeypore-Nabarangpur line has already been prepared, and is currently being prepared for the Jeypore-Malkangiri line.